CONTACT US 303-331-6185

Cartier

Cartier has embodied style and elegance since 1847, striving to exceed the limits of excellence, to create objects of the highest quality, and to invent new approaches to beauty.  Their stores evoke the feeling of stepping into a royal chamber to experience their designs.

We took on this full pad renovation in San Antonio to update the look and feel of their in-store location.  The main store remained open during construction and we were able to mitigate the dust and noise by erecting a solid barrier and utilizing our full complement of Festools.  The entire original pad was demolished, then we started from the stud out with trenching, flooring, framing and drywall, electrical, high level 5 wall finish, intricate lighting, then full fixture and graphics package installation.

Knowing how particular Cartier is about how they present their designs, our team worked closely with the local store manager as well as client reps to ensure that everything was done to their satisfaction.  Using our electronic document management system allowed our leads to communicate in real time with the PM's when it came to damages, issues, change orders and completion paperwork.  This allowed for a smooth and successful project.

More construction projects

Services provided for Cartier:

  • Demolition with Hard Barrier
  • Trenching
  • Electrical
  • Flooring
  • Lighting
  • Framing / Drywall
  • Level 5 Wall Finish
  • Fixture Installation
  • Graphics Installation

QUICK CONNECT

OUR TEAM IS STANDING BY TO GET YOUR PROJECT STARTED TODAY.